Case Studies

Project: Circle Square

This projects, valued at £45 million run by Waters and sub-contracted by TMJ Contractors ran for eight months. The site consisted of first and second internal fix joinery work, which included hanging doors, skirtings and architraves. The external works that took place included communal areas and external decking. WRS were tasked with sourcing 25 CSCS qualified Joiners and four CSCS qualified general labourers. The labour was sucessfully supplied to this project by WRS on time and with a high calibre of candidate in each case.

------------------------------------------------------------------------------------------------------------------------------------------------

Project: intu Watford

This projects, valued at £178 million run by Crownhouse ran for 12 months. The project consisted of Commercial Electrical Installation works, first and second highlevel lighting and power. Working in the service areas of the site the client required a high-spec job completion. WRS were tasked with sourcing 20 electricians. The labour was sucessfully supplied to this project by WRS on time and with a high calibre of candidate in each case.

------------------------------------------------------------------------------------------------------------------------------------------------

Project: Hampton By Hilton, Blackpool

This projects, valued at £9.7 million run by sub-contractors by JMC Mechanical and Electrical ran for six months. The project consisted of a full fit-outof the new hotel build, including first and second fix Mechanical and Electrical installation in both rooms and public areas. WRS were tasked with sourcing 9 Electricians and 10 Plumbers. The labour was sucessfully supplied to this project by WRS on time and with a high calibre of candidate in each case.


Linkedin